The Big Move, Part 4
This is the final part of The Big Move for now.... If you haven't read parts 1 through 3, this won't make nearly as much sense as if you had..
Friday, Dec. 15, 2017 - was the day of the Big Move for The Coupon Clippers!
Since no one was emailing us much, Sarah and the little kids (Emma and Joan) and I all went over to the original QT office and started sweeping and preparing for the final move… We were going to finally get the coupons out of the larger building and into the smaller one, and we needed to get the final bit of fabric stuff out of the smaller building, so there wouldn’t be a collision.
The guys had finally gone back to their painting, as I had maxxed out the fabrics that were ready to be shelved and I had shelves left over. I had asked them to be back over to our two offices around 12:30, to help with this final push.
Finally… we would be able to stop working around coupon working stations and just get our shelves in place.
By noon, the ladies were finished with their coupon orders and they were able to disassemble their work stations, which consist of tables, storage shelves and mini moving tables and chairs.
In the meantime, Sarah and the girls had been busily prepping the final stages of the old QT office, so that we could finally, finally, finally get their work stations out of the new larger building, so it would be cleared up for fabrics!
I was on the highest energy usage possible. Adrenalin was running high. There was an air of calm but sure excitement in the air! Everything was a mess. It was incredibly chaotic… Where do you put this while you’re putting THAT in THIS’s place? Some things would go out the back door and stay in the kitchen of the new place until the tables or shelving units were out of their locations. I’d zoom in with the vacuum cleaner to attempt to clean up paper dust before someone else set something else down. You can't tell it, but one of these rooms has become the backing and whites room! The other one has become the "pieces" room. it's lovely to have rooms for these areas.
I forgot to eat lunch. So, by 2:30, I was totally out of steam, and decisions began to be difficult to make. I said, “I’ve got to stop and go eat lunch and take the mail in. So, I did. I came back at 3:20, refreshed and ready to bring it on in!
So, now we have the ladies beautifully in their much smaller, more concise coupon room that just 3 days earlier had been the QuiltedTwins warehouse. We still have lots of fabric things over there, and we’ll continue to do so, as it has some great spots for storage--tucked away in the oversize bathroom, which has shower stalls. (Believe it or not!)
But, for now, we have both stations completely useable. (Saturday, Dec. 16, I went over and moved stuff around, and Ken came and built another shelving unit for me, and I vacuumed and organized for hours!)
I still have scads of organization to do, and about 500 more bolts of fabric to get up and over there, but at least now I have ROOM in which to put it once I do that! Once I get that done, I’ll get my house back and my husband will be incredibly relieved!
Oh no.. what’s that I hear? The Fed Ex truck pulling up just now? Oh yippeeee.. another fabric shipment…..
Check back often for beautiful fabrics at hugely discounted pricing!
QuiltedTwins.com!
These 5 Fat Quarters are perfect for so many projects!
100% Cotton
Fat Quarter Yard (approx. 18" x 21")
5 Individual Pieces totaling 1.25 yards of fabric
These beauties are all part of Rachael's picks fabrics from Quilted Twins site. Five fabrics that coordinate and would work great together in a scrappy type quilt.
Because they are part of Rachael's Picks fabric families, you can order more yardage of any of the five fat quarters for backings, as well. Rachael plans to carry each of these fabrics as a regular thing in the QuiltedTwins fabric by the yard department.
Purple